PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Connecting copper piping to the 2nd floor VAV Boxes Facing West.jpg Continued laying out block at bathrooms 133-136 Facing West.jpg Installing copper piping at the 3rd floor bathrooms Facing North.jpg Installing sprinkler branches at the 1st floor  Facing West.jpg Preping for the slab on grade Facing North.jpg Duct work up through the lower roof Facing South.jpg Temporary lighting at the 4th floor Facing North.jpg Metal framing around the perimeter of the lower roof Facing West.jpg Setting up the scafold at Stair -2 shear wall Facing North.jpg
Previous pageNext page Preping for the slab on grade Facing North
Preping for the slab on grade Facing North